Harvey O. Banks Pumping Plant
E62036
The Harvey O. Banks Pumping Plant is a major water pumping facility in California that serves as a key intake and distribution hub for the State Water Project.
Aliases (1)
Statements (46)
| Predicate | Object |
|---|---|
| instanceOf |
State Water Project facility
→
infrastructure facility → water pumping plant → |
| connectsTo |
California Aqueduct
→
|
| country |
United States
→
|
| distanceTo |
beginning of California Aqueduct
→
|
| hasEnvironmentalImpact |
affects Delta fish populations
→
|
| hasFunction |
distributing water to central and southern California
→
lifting water into the California Aqueduct → pumping water from the Sacramento–San Joaquin Delta → serving as main intake for the State Water Project → |
| hasPart |
electrical substation
→
fish protection facilities → intake channels → large-capacity pumping units → |
| hasRole |
primary export facility for Delta water in State Water Project
→
|
| hasStatus |
operational
→
|
| inception |
1960s
→
|
| isCriticalInfrastructureFor |
California water supply reliability
→
|
| isKeyNodeIn |
California statewide water distribution network
→
|
| isSubjectOf |
environmental regulation and litigation regarding Delta exports
→
|
| locatedIn |
California
→
Central Valley → Clifton Court Forebay area → Sacramento–San Joaquin Delta region → |
| locatedInAdministrativeEntity |
Contra Costa County
NERFINISHED
→
|
| locatedNear |
Byron, California
→
|
| namedAfter |
Harvey O. Banks
NERFINISHED
→
|
| namedForOccupation |
Harvey O. Banks, first director of the California Department of Water Resources
→
|
| operator |
California Department of Water Resources
→
|
| ownedBy |
State of California
→
|
| partOf |
California State Water Project
→
California water conveyance system → |
| purpose |
agricultural irrigation supply
→
industrial water supply → urban water supply → |
| regulatingAuthority |
California State Water Resources Control Board
→
U.S. Bureau of Reclamation → |
| servesRegion |
Central Valley
→
San Joaquin Valley → Southern California → |
| startPointOf |
California Aqueduct
→
|
| transportMedium |
freshwater
→
|
| usesEnergySource |
electric power
→
|
| waterSource |
Clifton Court Forebay
→
Sacramento–San Joaquin Delta → |
Referenced by (2)
| Subject (surface form when different) | Predicate |
|---|---|
|
California Aqueduct
("Banks Pumping Plant")
→
|
containsStructure |
|
State Water Project
→
|
hasComponent |