Triple
T29759444
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CLIL |
E753719
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | language teaching methodology |
C4871
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: language teaching methodology Context triple: [CLIL, instanceOf, language teaching methodology]
-
A.
pedagogical method
chosen
A pedagogical method is a structured approach or strategy used by educators to facilitate learning, guide instruction, and support students in achieving specific educational goals.
-
B.
pedagogy text
A pedagogy text is a written work that systematically presents theories, methods, and practical strategies for effective teaching and learning.
-
C.
language institute
A language institute is an educational organization dedicated to teaching one or more foreign or second languages through structured courses, resources, and language-learning support services.
-
D.
English language curriculum
An English language curriculum is a structured plan that outlines the goals, content, teaching methods, and assessment strategies for developing learners’ skills in reading, writing, speaking, and listening in English.
-
E.
education approach
An education approach is a coherent set of principles, methods, and strategies that guides how teaching and learning are designed, delivered, and evaluated.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0ef827ff88190ade56e0b0846b713 |
completed | April 28, 2026, 5:33 p.m. |
Created at: April 28, 2026, 8:31 p.m.