Triple

T28616322
Position Surface form Disambiguated ID Type / Status
Subject WaitForMultipleObjects E724280 entity
Predicate returnsOnTimeout P173382 FINISHED
Object WAIT_TIMEOUT LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: WAIT_TIMEOUT | Statement: [WaitForMultipleObjects, returnsOnTimeout, WAIT_TIMEOUT]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: returnsOnTimeout
Context triple: [WaitForMultipleObjects, returnsOnTimeout, WAIT_TIMEOUT]
  • A. returnsOnSuccess
    Indicates that an operation or function completes successfully and yields a return value or proceeds to a specified outcome only when no errors occur.
  • B. returnCondition
    Indicates the terms, state, or circumstances under which something that was previously given, lent, or transferred is expected or required to be returned.
  • C. returnedWith
    Indicates that an entity came back or was brought back accompanied by, or in possession of, another specified entity.
  • D. returnedDuring
    Indicates that one entity was given back or restored to another entity within a specified time period or event.
  • E. returnsAs
    Indicates that one entity goes back to or resumes a previous state, location, role, or condition associated with another entity.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01d816d7c8190a1fe27e3434041dc completed April 28, 2026, 2:37 a.m.
NER Named-entity recognition batch_69f6b56ed31481908c3e5d749e46bad9 completed May 3, 2026, 2:39 a.m.
PD Predicate disambiguation batch_69f6b3a5fd8481909433e923c5e24e55 completed May 3, 2026, 2:32 a.m.
PDg Predicate description generation batch_69f6b49339048190b617a6749f648825 completed May 3, 2026, 2:36 a.m.
Created at: April 28, 2026, 4:32 a.m.