Triple

T2768000
Position Surface form Disambiguated ID Type / Status
Subject Al-Anfal campaign E61381 entity
Predicate mainPhaseStartTime P7628 FINISHED
Object 1988 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1988 | Statement: [Al-Anfal campaign, mainPhaseStartTime, 1988]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mainPhaseStartTime
Context triple: [Al-Anfal campaign, mainPhaseStartTime, 1988]
  • A. mainPhase chosen
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • B. majorPhaseCompletion
    Indicates that a significant or primary phase of a larger process, project, or lifecycle has been fully completed.
  • C. programPhase
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • D. movementPhase
    Indicates the specific stage or step within a larger movement or motion process that an action or entity is currently in.
  • E. majorCapturePhase
    Indicates a significant or primary stage in a capture process where the main act of seizing, acquiring, or taking control occurs.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7bab6c8190a5c2efef19a8ef34 completed March 6, 2026, 9:47 p.m.
NER Named-entity recognition batch_69abddceb9d88190961e30d521a21552 completed March 7, 2026, 8:11 a.m.
PD Predicate disambiguation batch_69abdcfc5e1c8190a5ac2c48d3eaeb0a completed March 7, 2026, 8:08 a.m.
Created at: March 6, 2026, 9:57 p.m.