Triple

T27586970
Position Surface form Disambiguated ID Type / Status
Subject Red Hat support lifecycle policies E699710 entity
Predicate instanceOf P0 FINISHED
Object software maintenance policy C15482 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software maintenance policy
Context triple: [Red Hat support lifecycle policies, instanceOf, software maintenance policy]
  • A. software standard
    A software standard is an agreed-upon set of rules, formats, and practices that ensures compatibility, interoperability, and quality across different software systems and components.
  • B. public policy mechanism
    A public policy mechanism is a structured tool, process, or instrument used by governments or public institutions to influence behavior, allocate resources, or achieve specific societal outcomes.
  • C. software release
    A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
  • D. software engineering guideline chosen
    A software engineering guideline is a documented recommendation or best practice that directs how software should be designed, developed, tested, and maintained to ensure quality, consistency, and efficiency.
  • E. software
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a4cb8b881909b3a8d630fd89df2 completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 2:04 p.m.