Triple

T27528885
Position Surface form Disambiguated ID Type / Status
Subject High Energy Stereoscopic System E694912 entity
Predicate HESSIIStartOfOperations P163498 FINISHED
Object 2012 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2012 | Statement: [High Energy Stereoscopic System, HESSIIStartOfOperations, 2012]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: HESSIIStartOfOperations
Context triple: [High Energy Stereoscopic System, HESSIIStartOfOperations, 2012]
  • A. MAGIC-II_startOfOperations
    Indicates the point in time when the MAGIC-II system or operation begins functioning or becomes active.
  • B. MAGIC-I_startOfOperations
    Indicates the point in time when an entity’s operations or activities begin.
  • C. observatoryConstructionStart
    Indicates the date or event marking when construction of an observatory begins.
  • D. secondLHCRun
    Indicates that the referenced event, data, or activity occurred during the second operational run period of the Large Hadron Collider (LHC).
  • E. observatoryOperationalPeriod
    Indicates the time span during which an observatory is actively functioning and conducting observations.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef538608b081908b9f659bb09d5e0f completed April 27, 2026, 12:16 p.m.
NER Named-entity recognition batch_69f638d11c988190af7fd4572b08e038 completed May 2, 2026, 5:48 p.m.
PD Predicate disambiguation batch_69f63709e4848190b5cf322e06b23fb6 completed May 2, 2026, 5:40 p.m.
PDg Predicate description generation batch_69f638344b148190bf0414ef7c5f1f38 completed May 2, 2026, 5:45 p.m.
Created at: April 27, 2026, 1:25 p.m.