Triple

T25670125
Position Surface form Disambiguated ID Type / Status
Subject North Side trunk of CTA rail network E643645 entity
Predicate instanceOf P0 FINISHED
Object shared right-of-way C50621 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: shared right-of-way
Context triple: [North Side trunk of CTA rail network, instanceOf, shared right-of-way]
  • A. roadway approach
    A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
  • B. road pass
    A road pass is a designated route or permit that allows vehicles or travelers to cross through a specific roadway segment, often over or through difficult terrain or restricted areas.
  • C. parkway
    A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
  • D. road traffic agreement
    A road traffic agreement is a formal arrangement between parties—such as governments, municipalities, or private entities—that defines rights, responsibilities, and rules for the use, management, and regulation of road traffic within a specified area or network.
  • E. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7f69808190ad27df1006f6037a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 7:25 p.m.