Triple

T2561663
Position Surface form Disambiguated ID Type / Status
Subject Minecraft Dungeons E57253 entity
Predicate engine P6068 FINISHED
Object Unreal Engine 4 E183360 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Unreal Engine 4 | Statement: [Minecraft Dungeons, engine, Unreal Engine 4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Unreal Engine 4
Context triple: [Minecraft Dungeons, engine, Unreal Engine 4]
  • A. Unreal Engine chosen
    Unreal Engine is a widely used, high-performance game engine developed by Epic Games for creating 3D games, simulations, and real-time interactive experiences across multiple platforms.
  • B. NVIDIA Omniverse
    NVIDIA Omniverse is a real-time 3D simulation and collaboration platform that enables creators, engineers, and enterprises to build and connect physically accurate virtual worlds.
  • C. Autodesk 3ds Max
    Autodesk 3ds Max is a professional 3D modeling, animation, and rendering software widely used in game development, film, and architectural visualization.
  • D. Adobe Substance 3D
    Adobe Substance 3D is a suite of tools for creating, texturing, and rendering 3D assets, widely used in game development, visual effects, and design workflows.
  • E. F Reactor
    F Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4ef9008190a0e6d4422b9418b7 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd336183c819084ed7de8ccc4c548 completed March 7, 2026, 7:26 a.m.
NED1 Entity disambiguation (via context triple) batch_69af5d233dbc81909feb1127cffb027f completed March 9, 2026, 11:52 p.m.
Created at: March 6, 2026, 9:48 p.m.