Triple

T25130994
Position Surface form Disambiguated ID Type / Status
Subject Josephson voltage standard E629521 entity
Predicate instanceOf P0 FINISHED
Object quantum electrical standard C49767 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: quantum electrical standard
Context triple: [Josephson voltage standard, instanceOf, quantum electrical standard]
  • A. national measurement standards laboratory
    A national measurement standards laboratory is an official institution responsible for developing, maintaining, and disseminating a country’s primary measurement standards to ensure accuracy, consistency, and international compatibility of measurements.
  • B. atomic clock
    An atomic clock is an extremely precise timekeeping device that measures time based on the natural vibration frequencies of atoms, typically cesium or rubidium.
  • C. measurement standardization treaty
    A measurement standardization treaty is an international agreement that establishes and harmonizes common units, definitions, and procedures for measurements to ensure consistency and comparability across participating countries.
  • D. unit of electrical capacitance
    A unit of electrical capacitance is a standardized measure that quantifies the amount of electric charge stored per unit of electric potential difference in a capacitor.
  • E. IEC system
    An IEC system is an Interactive Evolutionary Computation framework in which human users iteratively evaluate and select candidate solutions so that an evolutionary algorithm can optimize designs, media, or parameters based on subjective preferences.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff338250819096ff6c8892804389 completed April 18, 2026, 3:49 a.m.
Created at: April 18, 2026, 6:28 a.m.