Triple

T25130993
Position Surface form Disambiguated ID Type / Status
Subject Josephson voltage standard E629521 entity
Predicate instanceOf P0 FINISHED
Object voltage standard C49766 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: voltage standard
Context triple: [Josephson voltage standard, instanceOf, voltage standard]
  • A. IEEE standard
    An IEEE standard is a formally documented set of technical specifications and guidelines developed and maintained by the Institute of Electrical and Electronics Engineers to ensure interoperability, safety, and quality across electrical, electronic, and computing technologies.
  • B. DIN standard
    A DIN standard is a formal technical specification developed by the German Institute for Standardization (DIN) that defines uniform criteria, dimensions, methods, or quality requirements for products, processes, and services.
  • C. IEC standard
    An IEC standard is a globally recognized technical specification developed by the International Electrotechnical Commission to ensure safety, interoperability, and performance of electrical and electronic systems and devices.
  • D. EIA standard
    An EIA standard is a set of technical guidelines and specifications developed by the Electronic Industries Alliance to ensure compatibility, safety, and interoperability of electronic components and systems.
  • E. electronics test standard
    An electronics test standard is a formally defined set of procedures, conditions, and criteria used to evaluate and verify the performance, safety, and compliance of electronic components and systems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff338250819096ff6c8892804389 completed April 18, 2026, 3:49 a.m.
Created at: April 18, 2026, 6:28 a.m.