Triple
T24380520
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 5x5=25 exhibition |
E614596
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Constructivist art exhibition |
C1208
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Constructivist art exhibition Context triple: [5x5=25 exhibition, instanceOf, Constructivist art exhibition]
-
A.
Constructivist artwork
A constructivist artwork is a geometric, often abstract piece that emphasizes industrial materials, functional structure, and the integration of art with modern technology and social purpose.
-
B.
art exhibition
chosen
An art exhibition is a curated public display of artworks organized around a theme, artist, or period, presented in a designated space for viewers to experience and interpret.
-
C.
contemporary art project
A contemporary art project is a time-bound, concept-driven artistic endeavor that uses current ideas, media, and contexts to explore, question, or reframe cultural, social, or aesthetic issues.
-
D.
art biennial-type event
A large-scale, recurring contemporary art exhibition held every two years that brings together diverse artists, curators, and audiences to showcase and explore current artistic practices and cultural discourses.
-
E.
constructivist artist
A constructivist artist is a creator who emphasizes abstract, geometric forms and industrial materials to explore the functional and social purposes of art within modern society.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7e362e481909e32fe4ef8269d4f |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:03 a.m.