Triple

T24380520
Position Surface form Disambiguated ID Type / Status
Subject 5x5=25 exhibition E614596 entity
Predicate instanceOf P0 FINISHED
Object Constructivist art exhibition C1208 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Constructivist art exhibition
Context triple: [5x5=25 exhibition, instanceOf, Constructivist art exhibition]
  • A. Constructivist artwork
    A constructivist artwork is a geometric, often abstract piece that emphasizes industrial materials, functional structure, and the integration of art with modern technology and social purpose.
  • B. art exhibition chosen
    An art exhibition is a curated public display of artworks organized around a theme, artist, or period, presented in a designated space for viewers to experience and interpret.
  • C. contemporary art project
    A contemporary art project is a time-bound, concept-driven artistic endeavor that uses current ideas, media, and contexts to explore, question, or reframe cultural, social, or aesthetic issues.
  • D. art biennial-type event
    A large-scale, recurring contemporary art exhibition held every two years that brings together diverse artists, curators, and audiences to showcase and explore current artistic practices and cultural discourses.
  • E. constructivist artist
    A constructivist artist is a creator who emphasizes abstract, geometric forms and industrial materials to explore the functional and social purposes of art within modern society.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7e362e481909e32fe4ef8269d4f completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:03 a.m.