Triple

T2420661
Position Surface form Disambiguated ID Type / Status
Subject Aral Sea E53408 entity
Predicate hasRestorationProject P11189 FINISHED
Object Kok-Aral Dam
The Kok-Aral Dam is a hydraulic structure in Kazakhstan built to separate and raise water levels in the North Aral Sea, aiding in the partial ecological and economic recovery of the region.
E266640 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kok-Aral Dam | Statement: [Aral Sea, hasRestorationProject, Kok-Aral Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kok-Aral Dam
Context triple: [Aral Sea, hasRestorationProject, Kok-Aral Dam]
  • A. Keban Dam
    Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
  • B. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • C. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • D. Atatürk Dam
    Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
  • E. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kok-Aral Dam
Triple: [Aral Sea, hasRestorationProject, Kok-Aral Dam]
Generated description
The Kok-Aral Dam is a hydraulic structure in Kazakhstan built to separate and raise water levels in the North Aral Sea, aiding in the partial ecological and economic recovery of the region.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kok-Aral Dam
Target entity description: The Kok-Aral Dam is a hydraulic structure in Kazakhstan built to separate and raise water levels in the North Aral Sea, aiding in the partial ecological and economic recovery of the region.
  • A. Keban Dam
    Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
  • B. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • C. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • D. Atatürk Dam
    Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
  • E. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasRestorationProject
Context triple: [Aral Sea, hasRestorationProject, Kok-Aral Dam]
  • A. hasRestorationActivities chosen
    Indicates that an entity carries out, is involved in, or is associated with actions aimed at restoring or rehabilitating another entity or resource.
  • B. hasRestoration
    Indicates that an entity has undergone, is undergoing, or is associated with a process of repair, renewal, or restoration.
  • C. hasReconstructionWork
    Indicates that an entity is undergoing, has undergone, or is associated with reconstruction or restoration work.
  • D. restorationEvent
    Indicates an event in which something previously altered, damaged, or degraded is returned to a former or improved state.
  • E. reconstructionOrRestorationDate
    Indicates the date on which an entity was reconstructed or restored after damage, alteration, or deterioration.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab495c44d48190b7235b23719bc3f6 completed March 6, 2026, 9:38 p.m.
NER Named-entity recognition batch_69abc9f342e88190a430b02842ded418 completed March 7, 2026, 6:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69aebf57b0708190bf4d38c51e02309f completed March 9, 2026, 12:38 p.m.
NEDg Description generation batch_69aec495e4e88190a1b9929161aba193 completed March 9, 2026, 1:01 p.m.
NED2 Entity disambiguation (via description) batch_69aec570ec88819089a2afc42aec1088 completed March 9, 2026, 1:04 p.m.
PD Predicate disambiguation batch_69abc5a889948190b77de4ef6ac815a8 completed March 7, 2026, 6:28 a.m.
Created at: March 6, 2026, 9:42 p.m.