Triple

T23577438
Position Surface form Disambiguated ID Type / Status
Subject Gull Island Generating Station E580298 entity
Predicate plannedCapacityMW P153243 FINISHED
Object approximately 2250 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 2250 | Statement: [Gull Island Generating Station, plannedCapacityMW, approximately 2250]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedCapacityMW
Context triple: [Gull Island Generating Station, plannedCapacityMW, approximately 2250]
  • A. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • C. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • D. electricalCapacityPerReactor_MWe
    Indicates the electrical power output capacity, measured in megawatts electric (MWe), that is provided by each individual reactor.
  • E. solarPlantCapacity
    Indicates the maximum electrical power output that a solar power plant is designed or able to produce.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24601a9108190bc31e83833c980e4 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1afd725d88190b33c8fb26603db59 completed April 29, 2026, 7:14 a.m.
PD Predicate disambiguation batch_69f118bcc0b08190b25a8dddfd461a0e completed April 28, 2026, 8:29 p.m.
PDg Predicate description generation batch_69f12760784c8190aaeff002ef31febe completed April 28, 2026, 9:32 p.m.
Created at: April 17, 2026, 6:38 p.m.