Triple
T23577438
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gull Island Generating Station |
E580298
|
entity |
| Predicate | plannedCapacityMW |
P153243
|
FINISHED |
| Object | approximately 2250 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 2250 | Statement: [Gull Island Generating Station, plannedCapacityMW, approximately 2250]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: plannedCapacityMW Context triple: [Gull Island Generating Station, plannedCapacityMW, approximately 2250]
-
A.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
B.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
-
C.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
D.
electricalCapacityPerReactor_MWe
Indicates the electrical power output capacity, measured in megawatts electric (MWe), that is provided by each individual reactor.
-
E.
solarPlantCapacity
Indicates the maximum electrical power output that a solar power plant is designed or able to produce.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24601a9108190bc31e83833c980e4 |
completed | April 17, 2026, 2:38 p.m. |
| NER | Named-entity recognition | batch_69f1afd725d88190b33c8fb26603db59 |
completed | April 29, 2026, 7:14 a.m. |
| PD | Predicate disambiguation | batch_69f118bcc0b08190b25a8dddfd461a0e |
completed | April 28, 2026, 8:29 p.m. |
| PDg | Predicate description generation | batch_69f12760784c8190aaeff002ef31febe |
completed | April 28, 2026, 9:32 p.m. |
Created at: April 17, 2026, 6:38 p.m.