plannedCapacityMW
P153243
predicate
Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
Sample triples (1)
| Subject | Object |
|---|---|
|
Lower Churchill Project
surface form:
Gull Island Generating Station
|
approximately 2250 ⓘ |