Triple

T23435478
Position Surface form Disambiguated ID Type / Status
Subject Wabash and Erie Canal E563448 entity
Predicate instanceOf P0 FINISHED
Object 19th-century public works project C20963 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 19th-century public works project
Context triple: [Wabash and Erie Canal, instanceOf, 19th-century public works project]
  • A. 19th-century architectural project
    A 19th-century architectural project is a planned building or complex designed and developed during the 1800s, reflecting the period’s characteristic styles, technologies, and cultural influences.
  • B. 19th-century infrastructure chosen
    19th-century infrastructure encompasses the transportation, communication, and utility systems—such as railways, canals, telegraph networks, roads, and early urban services—built during the 1800s that enabled industrialization and expanded economic and social connectivity.
  • C. 19th-century bridge
    A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
  • D. 18th-century architectural project
    An 18th-century architectural project is a designed building or complex conceived and planned during the 1700s, reflecting the period’s prevailing styles, construction techniques, and cultural or political ideals.
  • E. 19th-century industrial enterprise
    A 19th-century industrial enterprise is a large-scale, mechanized business organization that harnesses steam power, factory production, and wage labor to mass-produce goods within emerging capitalist markets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24553980c8190bb66a2ae0bdab125 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 5:50 p.m.