Triple
T22927873
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Civil War prison system of the Confederacy |
E569357
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military prison network |
C34562
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military prison network Context triple: [Civil War prison system of the Confederacy, instanceOf, military prison network]
-
A.
detention facility network
chosen
A detention facility network is an interconnected system of prisons, jails, and holding centers coordinated through shared infrastructure, policies, and information flows to manage the custody and movement of detained individuals.
-
B.
military training infrastructure network
A military training infrastructure network is an integrated system of facilities, ranges, technologies, and support services designed to plan, deliver, and sustain training activities for armed forces across multiple locations.
-
C.
prison
A prison is a secure facility where individuals are legally confined and deprived of certain freedoms as punishment for crimes or while awaiting trial.
-
D.
men's prison
A men's prison is a secure correctional facility designed to confine, manage, and rehabilitate male individuals convicted of crimes under the criminal justice system.
-
E.
military base network
A military base network is an interconnected system of communication, data, and operational infrastructure linking facilities, units, and resources across one or more military installations to support command, control, logistics, and security functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458f7d008190901dccbaebeaba24 |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:43 p.m.