Triple

T21519957
Position Surface form Disambiguated ID Type / Status
Subject 都筑郡 E530945 entity
Predicate 関連幹線道路 P131761 FINISHED
Object 東名高速道路 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 東名高速道路 | Statement: [都筑郡, 関連幹線道路, 東名高速道路]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 東名高速道路
Context triple: [都筑郡, 関連幹線道路, 東名高速道路]
  • A. 東名高速道路 chosen
    東名高速道路 is a major Japanese expressway connecting the Tokyo metropolitan area with the Chūbu and Tōkai regions, serving as a key artery for both passenger and freight traffic.
  • B. Nagoya Expressway
    Nagoya Expressway is an urban expressway network serving the Nagoya metropolitan area in Japan, providing high-speed road connections within the city and to surrounding regions.
  • C. Tōkai-Kanjō Expressway
    The Tōkai-Kanjō Expressway is a major regional expressway in Japan that forms a loop around the Tōkai metropolitan area, connecting key cities and industrial zones in Aichi and surrounding prefectures.
  • D. Higashi-Kanto Expressway
    The Higashi-Kanto Expressway is a major Japanese expressway in the Kanto region that connects the Tokyo area with Chiba Prefecture and serves as a key route to Narita International Airport.
  • E. 中国自動車道
    中国自動車道は、本州西部の中国地方を東西に横断し、大阪方面と山口県・九州方面を結ぶ日本の主要高速自動車国道である。
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45d95a081908e7962ad215da746 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ee884af0f08190bc1f3d70e57a325d completed April 26, 2026, 9:48 p.m.
Created at: April 16, 2026, 6:26 p.m.