Triple

T21503493
Position Surface form Disambiguated ID Type / Status
Subject British Railways Modernisation Plan E530537 entity
Predicate instanceOf P0 FINISHED
Object transport policy document C10250 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport policy document
Context triple: [British Railways Modernisation Plan, instanceOf, transport policy document]
  • A. transport policy framework
    A transport policy framework is a structured set of principles, goals, and regulatory tools that guide the planning, funding, operation, and governance of transportation systems to achieve economic, social, and environmental objectives.
  • B. transport policy body
    A transport policy body is an organization or authority responsible for developing, coordinating, and overseeing regulations, strategies, and standards that govern transportation systems and services.
  • C. transportation standard
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • D. transport sector
    The transport sector encompasses all systems, services, and infrastructure involved in moving people and goods by road, rail, air, and water.
  • E. transport strategy chosen
    A transport strategy is a high-level plan that defines how people and goods will be moved efficiently, safely, sustainably, and cost-effectively within and between areas over a given time horizon.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c45c81f08190a6b8bbb70a45aae7 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:24 p.m.