Triple

T20283253
Position Surface form Disambiguated ID Type / Status
Subject High Speed 2 E503204 entity
Predicate instanceOf P0 FINISHED
Object high-speed railway project C34688 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-speed railway project
Context triple: [High Speed 2, instanceOf, high-speed railway project]
  • A. intercity passenger rail project chosen
    An intercity passenger rail project is a coordinated planning, design, and construction effort to develop or improve rail infrastructure and services that transport people efficiently between cities over medium to long distances.
  • B. high-speed test train
    A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
  • C. railway modernisation project
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • D. rapid transit expansion project
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • E. proposed high-speed ground transportation system
    A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b0e79c8190bd61f22ef1329fa8 completed April 16, 2026, 10:06 a.m.
Created at: April 16, 2026, 10:40 a.m.