High Speed 2

E503204

High Speed 2 is a planned high-speed railway line in the United Kingdom intended to increase capacity and reduce journey times between major cities such as London, Birmingham, Manchester, and Leeds.

Jump to: Surface forms Statements Referenced by

Observed surface forms (2)

Surface form Occurrences
HS2 1
High Speed 2 Phase One 1

Statements (48)

Predicate Object
instanceOf high-speed railway project
rail infrastructure project
benefitClaimed increased capacity on existing classic lines
reduced journey time London–Birmingham
reduced journey time London–Manchester
connectionToNetwork East Coast Main Line NERFINISHED
Midland Main Line NERFINISHED
West Coast Main Line NERFINISHED
constructionMethod mix of tunnels, cuttings, embankments and viaducts
controversy high projected cost
route impact on local communities
country United Kingdom
designFeature dedicated high-speed tracks
grade-separated junctions
environmentalConcern construction noise and disruption
impact on ancient woodlands
fundingSource UK government NERFINISHED
hasSection HS2 Phase 2a NERFINISHED
HS2 Phase 2b NERFINISHED
HS2 Phase One NERFINISHED
intendedRollingStockType high-speed electric multiple units
interchangeStationPlanned Old Oak Common NERFINISHED
lineLengthPlanned approximately 530 km
locatedIn England
managingOrganisation HS2 Ltd NERFINISHED
maximumDesignSpeed 360 km/h
operatorPlanned Great British Railways NERFINISHED
parliamentaryApproval High Speed Rail (London – West Midlands) Act 2017 NERFINISHED
plannedToServeCity Birmingham NERFINISHED
Leeds NERFINISHED
London NERFINISHED
Manchester NERFINISHED
planningStatus partially under construction
publicDebate economic value versus cost
regional rebalancing of the UK economy
purpose improve connectivity between major UK cities
increase rail capacity
reduce journey times
safetySystemPlanned ETCS NERFINISHED
shortName HS2 NERFINISHED
sponsor UK Department for Transport NERFINISHED
stationPlanned Birmingham Curzon Street NERFINISHED
Birmingham Interchange NERFINISHED
Manchester Airport station NERFINISHED
Manchester Piccadilly NERFINISHED
terminusPlanned London Euston NERFINISHED
trackGauge standard gauge
usesElectrificationSystem 25 kV AC overhead line

Referenced by (4)

Full triples — surface form annotated when it differs from this entity's canonical label.

British railway network hasPart High Speed 2
Northern Powerhouse keyTransportProject High Speed 2
this entity surface form: HS2
London–Birmingham transport corridor plannedUpgrade High Speed 2
this entity surface form: High Speed 2 Phase One