High Speed 2
E503204
High Speed 2 is a planned high-speed railway line in the United Kingdom intended to increase capacity and reduce journey times between major cities such as London, Birmingham, Manchester, and Leeds.
Observed surface forms (2)
| Surface form | Occurrences |
|---|---|
| HS2 | 1 |
| High Speed 2 Phase One | 1 |
Statements (48)
| Predicate | Object |
|---|---|
| instanceOf |
high-speed railway project
ⓘ
rail infrastructure project ⓘ |
| benefitClaimed |
increased capacity on existing classic lines
ⓘ
reduced journey time London–Birmingham ⓘ reduced journey time London–Manchester ⓘ |
| connectionToNetwork |
East Coast Main Line
NERFINISHED
ⓘ
Midland Main Line NERFINISHED ⓘ West Coast Main Line NERFINISHED ⓘ |
| constructionMethod | mix of tunnels, cuttings, embankments and viaducts ⓘ |
| controversy |
high projected cost
ⓘ
route impact on local communities ⓘ |
| country | United Kingdom ⓘ |
| designFeature |
dedicated high-speed tracks
ⓘ
grade-separated junctions ⓘ |
| environmentalConcern |
construction noise and disruption
ⓘ
impact on ancient woodlands ⓘ |
| fundingSource | UK government NERFINISHED ⓘ |
| hasSection |
HS2 Phase 2a
NERFINISHED
ⓘ
HS2 Phase 2b NERFINISHED ⓘ HS2 Phase One NERFINISHED ⓘ |
| intendedRollingStockType | high-speed electric multiple units ⓘ |
| interchangeStationPlanned | Old Oak Common NERFINISHED ⓘ |
| lineLengthPlanned | approximately 530 km ⓘ |
| locatedIn | England ⓘ |
| managingOrganisation | HS2 Ltd NERFINISHED ⓘ |
| maximumDesignSpeed | 360 km/h ⓘ |
| operatorPlanned | Great British Railways NERFINISHED ⓘ |
| parliamentaryApproval | High Speed Rail (London – West Midlands) Act 2017 NERFINISHED ⓘ |
| plannedToServeCity |
Birmingham
NERFINISHED
ⓘ
Leeds NERFINISHED ⓘ London NERFINISHED ⓘ Manchester NERFINISHED ⓘ |
| planningStatus | partially under construction ⓘ |
| publicDebate |
economic value versus cost
ⓘ
regional rebalancing of the UK economy ⓘ |
| purpose |
improve connectivity between major UK cities
ⓘ
increase rail capacity ⓘ reduce journey times ⓘ |
| safetySystemPlanned | ETCS NERFINISHED ⓘ |
| shortName | HS2 NERFINISHED ⓘ |
| sponsor | UK Department for Transport NERFINISHED ⓘ |
| stationPlanned |
Birmingham Curzon Street
NERFINISHED
ⓘ
Birmingham Interchange NERFINISHED ⓘ Manchester Airport station NERFINISHED ⓘ Manchester Piccadilly NERFINISHED ⓘ |
| terminusPlanned | London Euston NERFINISHED ⓘ |
| trackGauge | standard gauge ⓘ |
| usesElectrificationSystem | 25 kV AC overhead line ⓘ |
Referenced by (4)
Full triples — surface form annotated when it differs from this entity's canonical label.
this entity surface form:
HS2
this entity surface form:
High Speed 2 Phase One