Triple

T19118284
Position Surface form Disambiguated ID Type / Status
Subject USRA Heavy Santa Fe 2-10-2 E467966 entity
Predicate instanceOf P0 FINISHED
Object 2-10-2 locomotive C3459 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 2-10-2 locomotive
Context triple: [USRA Heavy Santa Fe 2-10-2, instanceOf, 2-10-2 locomotive]
  • A. streamlined locomotive
    A streamlined locomotive is a high-speed railway engine designed with smooth, aerodynamic contours to reduce air resistance and improve efficiency and performance.
  • B. railway locomotive chosen
    A railway locomotive is a powered rail vehicle that provides the motive force to pull or push trains along railway tracks.
  • C. EMD 710 series engine
    The EMD 710 series engine is a two-stroke, turbocharged diesel locomotive and marine prime mover known for its modular design, high power-to-weight ratio, and improved fuel efficiency over earlier EMD engine families.
  • D. locomotive works
    A locomotive works is an industrial facility where locomotives are designed, manufactured, assembled, repaired, and maintained.
  • E. Southern Pacific Railroad steam locomotive class
    A Southern Pacific Railroad steam locomotive class is a group of steam engines built or rostered by the Southern Pacific Railroad that share common design, performance, and operational characteristics for specific types of rail service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd06a26481908039e2a1bae8c597 completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 12:05 p.m.