Triple

T18619536
Position Surface form Disambiguated ID Type / Status
Subject COP15 Accord E455111 entity
Predicate longTermFinanceGoalYear P26643 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [COP15 Accord, longTermFinanceGoalYear, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: longTermFinanceGoalYear
Context triple: [COP15 Accord, longTermFinanceGoalYear, 2020]
  • A. hasGoalYear chosen
    Indicates that an entity is associated with a specific target year by which a goal or objective is intended to be achieved.
  • B. planningYear
    Indicates the year in which planning or preparation activities for something are scheduled or designated to occur.
  • C. planningStartYear
    Indicates the calendar year in which planning for an activity, project, or process begins.
  • D. economicGoal
    Indicates that an entity has a targeted economic outcome or objective it aims to achieve.
  • E. hasPlanningGoal
    Indicates that an entity is associated with, or directed toward achieving, a specific planning objective or target state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38bbe7c8190bdec3138e7d413c9 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e54d07dc288190bb3b8b5ab06518da completed April 19, 2026, 9:45 p.m.
PD Predicate disambiguation batch_69e478d4a7948190a4bb9223bb5dddfc completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 11:46 a.m.