Triple

T18565278
Position Surface form Disambiguated ID Type / Status
Subject Form 13D E453745 entity
Predicate updateRequirement P63095 FINISHED
Object must be amended promptly upon material changes in the facts set forth LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: must be amended promptly upon material changes in the facts set forth | Statement: [Form 13D, updateRequirement, must be amended promptly upon material changes in the facts set forth]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: updateRequirement
Context triple: [Form 13D, updateRequirement, must be amended promptly upon material changes in the facts set forth]
  • A. changesRequirement
    Indicates that one entity modifies, updates, or alters the requirements associated with another entity.
  • B. requiresUpdate chosen
    Indicates that an entity must be refreshed, modified, or brought to a newer state before it can be considered current or valid.
  • C. updatesSpecificationOf
    Indicates that one entity revises, modifies, or replaces the existing specification of another entity.
  • D. expandedRequirement
    Indicates that one requirement elaborates, refines, or adds detail to another requirement.
  • E. projectRequirement
    Indicates that one entity specifies a necessary condition, resource, or criterion that must be satisfied for a project associated with another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38974308190a9174430ef256b73 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e53afe3ee081909eeee62c889948f4 completed April 19, 2026, 8:28 p.m.
PD Predicate disambiguation batch_69e478c16e0c8190b03966aa23c395a6 completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 11:42 a.m.