Triple
T17161188
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arapuni Power Station |
E416481
|
entity |
| Predicate | hasInstalledCapacity_MW |
P11312
|
FINISHED |
| Object | 196 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 196 | Statement: [Arapuni Power Station, hasInstalledCapacity_MW, 196]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasInstalledCapacity_MW Context triple: [Arapuni Power Station, hasInstalledCapacity_MW, 196]
-
A.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
B.
installedCapacity
chosen
Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
-
C.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
D.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
-
E.
turbineCapacity
Indicates the power-generating capacity or rated output of a turbine.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886d279c081909f8ff1f743ddeb69 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3f91258648190a40396067ba5ecd3 |
completed | April 18, 2026, 9:35 p.m. |
| PD | Predicate disambiguation | batch_69e3830d2a90819092386717dc56f0e8 |
completed | April 18, 2026, 1:11 p.m. |
Created at: April 10, 2026, 5:37 a.m.