Triple

T17161188
Position Surface form Disambiguated ID Type / Status
Subject Arapuni Power Station E416481 entity
Predicate hasInstalledCapacity_MW P11312 FINISHED
Object 196 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 196 | Statement: [Arapuni Power Station, hasInstalledCapacity_MW, 196]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasInstalledCapacity_MW
Context triple: [Arapuni Power Station, hasInstalledCapacity_MW, 196]
  • A. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. installedCapacity chosen
    Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
  • C. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • D. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • E. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d279c081909f8ff1f743ddeb69 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3f91258648190a40396067ba5ecd3 completed April 18, 2026, 9:35 p.m.
PD Predicate disambiguation batch_69e3830d2a90819092386717dc56f0e8 completed April 18, 2026, 1:11 p.m.
Created at: April 10, 2026, 5:37 a.m.