Triple

T16946665
Position Surface form Disambiguated ID Type / Status
Subject S-129 Under Keel Clearance Management product specification E411084 entity
Predicate instanceOf P0 FINISHED
Object under-keel clearance management standard C15332 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: under-keel clearance management standard
Context triple: [S-129 Under Keel Clearance Management product specification, instanceOf, under-keel clearance management standard]
  • A. maritime safety regulation
    Maritime safety regulation is the body of laws, standards, and procedures designed to prevent accidents, protect life, property, and the marine environment, and ensure safe operations in maritime activities.
  • B. maritime navigation authority
    A maritime navigation authority is an organization responsible for regulating, managing, and ensuring the safety and efficiency of vessel movements and navigational systems within designated waters.
  • C. maritime safety certificate
    A maritime safety certificate is an official document issued by a competent authority confirming that a vessel complies with required safety regulations and standards for operation at sea.
  • D. marine accident investigation body
    A marine accident investigation body is an independent authority responsible for examining maritime incidents to determine causes, identify safety issues, and recommend measures to prevent future occurrences.
  • E. IHO standard chosen
    An IHO standard is an internationally agreed set of specifications and guidelines issued by the International Hydrographic Organization to ensure uniformity, reliability, and interoperability in hydrographic data, charts, and related maritime information.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c886688190967be07322597ac9 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:31 a.m.