Triple

T16926175
Position Surface form Disambiguated ID Type / Status
Subject AP1000 E410578 entity
Predicate gracePeriodDuration P124771 FINISHED
Object at least 72 hours without AC power LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: at least 72 hours without AC power | Statement: [AP1000, gracePeriodDuration, at least 72 hours without AC power]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gracePeriodDuration
Context triple: [AP1000, gracePeriodDuration, at least 72 hours without AC power]
  • A. renewalGracePeriod
    Indicates the time window after a subscription or contract expires during which it can still be renewed without being treated as fully lapsed or terminated.
  • B. redemptionGracePeriod
    Indicates the time-limited period after something (typically a registration or subscription) has expired during which it can still be restored or renewed, often under special conditions or fees.
  • C. withdrawalGracePeriod
    Indicates the time window after an action or event during which a withdrawal can be made without incurring penalties or additional restrictions.
  • D. grantPeriod
    Indicates the time span or duration for which a grant or funding award is valid and in effect.
  • E. grantPeriodEnd
    Indicates the date or point in time when a grant’s active period or eligibility officially ends.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c7b1e481908c3766dfa8c13458 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3cdf2dcd881909798bd245e18c599 completed April 18, 2026, 6:31 p.m.
PD Predicate disambiguation batch_69e32b982f548190b08414d55810de19 completed April 18, 2026, 6:58 a.m.
PDg Predicate description generation batch_69e32d7aae948190bc238d765795688c completed April 18, 2026, 7:06 a.m.
Created at: April 10, 2026, 5:30 a.m.