Triple

T16484260
Position Surface form Disambiguated ID Type / Status
Subject Flamanville 3 nuclear power plant E400397 entity
Predicate gridConnectionStatus P122956 FINISHED
Object not yet in commercial operation as of 2024 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: not yet in commercial operation as of 2024 | Statement: [Flamanville 3 nuclear power plant, gridConnectionStatus, not yet in commercial operation as of 2024]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridConnectionStatus
Context triple: [Flamanville 3 nuclear power plant, gridConnectionStatus, not yet in commercial operation as of 2024]
  • A. hasGridConnection
    Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
  • B. gridConnectionCountry
    Indicates that an entity’s electrical grid is connected to, or integrated with, the power grid of a specified country.
  • C. gridConnectionAgreementWith
    Indicates an agreement establishing the terms and conditions under which one party is connected to another party’s electrical grid.
  • D. gridConnectionPurpose
    Indicates the intended role or function of a connection to an electrical grid within a system or network.
  • E. gridInterconnection
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d883813098819084f5409539723b59 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e32e05bf448190947b9da15fd29d0a completed April 18, 2026, 7:08 a.m.
PD Predicate disambiguation batch_69e22706b0588190a48a951c5211a617 completed April 17, 2026, 12:26 p.m.
PDg Predicate description generation batch_69e24556c1348190902a4d116c3137d9 completed April 17, 2026, 2:36 p.m.
Created at: April 10, 2026, 5:13 a.m.