gridConnectionStatus
P122956
predicate
Indicates whether and how an entity is currently connected to an electrical or energy distribution grid.
Observed surface forms (2)
- gridStatus ×2
- gridConnectionStatusBefore2022Invasion ×1
Sample triples (10)
| Subject | Object |
|---|---|
| Flamanville 3 nuclear power plant | not yet in commercial operation as of 2024 ⓘ |
| Kashiwazaki-Kariwa Nuclear Power Plant | not generating electricity as of early 2020s ⓘ |
| Zaporizhzhia Nuclear Power Plant | fully connected to Ukrainian power grid via predicate surface "gridConnectionStatusBefore2022Invasion" ⓘ |
| Kalinin-4 | connected to national grid ⓘ |
| Lingen nuclear power plant | disconnected ⓘ |
|
Morgan Offshore Wind Project (planned)
surface form:
Morgan Offshore Wind Project
|
planned ⓘ |
| Fukushima Daiichi Unit 1 | disconnected from grid ⓘ |
| Cowley Ridge Wind Farm | grid-connected via predicate surface "gridStatus" ⓘ |
| Braidwood Nuclear Generating Station | operational via predicate surface "gridStatus" ⓘ |
| Bataan Nuclear Power Plant | never connected to the grid ⓘ |