Triple

T16323356
Position Surface form Disambiguated ID Type / Status
Subject CA/T E396352 entity
Predicate alsoKnownAs P39 FINISHED
Object Boston’s Central Artery/Tunnel Project E310522 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boston’s Central Artery/Tunnel Project | Statement: [CA/T, alsoKnownAs, Boston’s Central Artery/Tunnel Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boston’s Central Artery/Tunnel Project
Context triple: [CA/T, alsoKnownAs, Boston’s Central Artery/Tunnel Project]
  • A. Central Artery/Tunnel Project chosen
    The Central Artery/Tunnel Project, commonly known as the "Big Dig," was a massive Boston infrastructure megaproject that rerouted the city’s central highway into tunnels to reduce congestion and reclaim urban space.
  • B. North Shore Connector project
    The North Shore Connector project is a Pittsburgh light rail expansion that extended service under the Allegheny River to connect Downtown with the city’s North Shore attractions and neighborhoods.
  • C. Massachusetts Bay Outfall Tunnel
    The Massachusetts Bay Outfall Tunnel is a major deep-rock wastewater discharge tunnel off the coast of Boston that carries treated effluent far offshore to reduce pollution in Boston Harbor and Massachusetts Bay.
  • D. Eastern Freeway project
    The Eastern Freeway project is a major controlled-access road corridor in Mumbai designed to provide a fast, signal-free link between the city’s eastern suburbs and South Mumbai, significantly reducing travel time and congestion.
  • E. Big Dig
    The Big Dig was a massive and controversial highway and tunnel megaproject in Boston that rerouted traffic underground to replace the city’s elevated Central Artery.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f255b788190a400eba031dd85d8 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e296b82fe88190a448597b7827f859 completed April 17, 2026, 8:23 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00260ab4208190900f21cb4f08f926 completed May 10, 2026, 6:30 a.m.
Created at: April 10, 2026, 5:06 a.m.