Triple

T15449858
Position Surface form Disambiguated ID Type / Status
Subject 2008 Kosi flood E370120 entity
Predicate relatedTo P37 FINISHED
Object India–Nepal water management
India–Nepal water management refers to the complex system of bilateral agreements, infrastructure, and cooperative (often contentious) policies governing the shared rivers and transboundary water resources between India and Nepal.
E1157220 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: India–Nepal water management | Statement: [2008 Kosi flood, relatedTo, India–Nepal water management]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: India–Nepal water management
Context triple: [2008 Kosi flood, relatedTo, India–Nepal water management]
  • A. Teesta hydropower cascade
    Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
  • B. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • C. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • D. Teesta Low Dam Project
    Teesta Low Dam Project is a run-of-the-river hydroelectric power project on the Teesta River in India, developed to generate electricity and support regional power needs.
  • E. Beas Project
    Beas Project is a major multipurpose river valley development scheme in northern India focused on irrigation, hydropower generation, and water management on the Beas and Sutlej rivers.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: India–Nepal water management
Triple: [2008 Kosi flood, relatedTo, India–Nepal water management]
Generated description
India–Nepal water management refers to the complex system of bilateral agreements, infrastructure, and cooperative (often contentious) policies governing the shared rivers and transboundary water resources between India and Nepal.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: India–Nepal water management
Target entity description: India–Nepal water management refers to the complex system of bilateral agreements, infrastructure, and cooperative (often contentious) policies governing the shared rivers and transboundary water resources between India and Nepal.
  • A. Teesta hydropower cascade
    Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
  • B. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • C. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • D. Teesta Low Dam Project
    Teesta Low Dam Project is a run-of-the-river hydroelectric power project on the Teesta River in India, developed to generate electricity and support regional power needs.
  • E. Beas Project
    Beas Project is a major multipurpose river valley development scheme in northern India focused on irrigation, hydropower generation, and water management on the Beas and Sutlej rivers.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a19180081909925012fbf4e62a3 completed April 10, 2026, 2:02 a.m.
NER Named-entity recognition batch_69e03ef9334c81908541e231b43eb012 completed April 16, 2026, 1:44 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff21b1e9688190a283dbc552072ce0 completed May 9, 2026, 11:59 a.m.
NEDg Description generation batch_69ff22b9c980819093e05036ba21eaf0 completed May 9, 2026, 12:04 p.m.
NED2 Entity disambiguation (via description) batch_69ff2339ae808190bf2d4676215399c0 completed May 9, 2026, 12:06 p.m.
Created at: April 10, 2026, 3:21 a.m.