Triple

T13840662
Position Surface form Disambiguated ID Type / Status
Subject Machine de Marly E332646 entity
Predicate instanceOf P0 FINISHED
Object hydraulic engineering work C26460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydraulic engineering work
Context triple: [Machine de Marly, instanceOf, hydraulic engineering work]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. engineered waterway chosen
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • C. earthwork
    An earthwork is a large-scale construction or artistic formation made by shaping, moving, or arranging soil, rock, and other natural materials in the landscape.
  • D. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • E. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ae7c88190b0dd41bdafeb5999 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:13 p.m.