Triple
T13840662
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Machine de Marly |
E332646
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydraulic engineering work |
C26460
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydraulic engineering work Context triple: [Machine de Marly, instanceOf, hydraulic engineering work]
-
A.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
B.
engineered waterway
chosen
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
C.
earthwork
An earthwork is a large-scale construction or artistic formation made by shaping, moving, or arranging soil, rock, and other natural materials in the landscape.
-
D.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
E.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5ae7c88190b0dd41bdafeb5999 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:13 p.m.