Triple
T13578833
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Greece and Bulgaria |
E324355
|
entity |
| Predicate | haveCrossBorderCorridor |
P110142
|
FINISHED |
| Object |
Pan-European Transport Corridor IX
Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
|
E1055467
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pan-European Transport Corridor IX | Statement: [Greece and Bulgaria, haveCrossBorderCorridor, Pan-European Transport Corridor IX]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pan-European Transport Corridor IX Context triple: [Greece and Bulgaria, haveCrossBorderCorridor, Pan-European Transport Corridor IX]
-
A.
Pan-European Corridor IV
Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
-
B.
Pan-European Corridor III
Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
-
C.
Scandinavia–Central Europe transport corridor
The Scandinavia–Central Europe transport corridor is a key trans-European route that links the Nordic countries with central European regions through a network of road, rail, and maritime connections.
-
D.
Corridor X (Pan-European Corridor X)
Corridor X (Pan-European Corridor X) is a major trans-European transport route connecting Central Europe with the Balkans and the Aegean Sea, facilitating significant international road and rail traffic.
-
E.
Pan-European Corridor V
Pan-European Corridor V is a major trans-European transport route that links key cities in Central and Eastern Europe, facilitating trade and mobility between Western Europe and countries such as Ukraine and Poland.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Pan-European Transport Corridor IX Triple: [Greece and Bulgaria, haveCrossBorderCorridor, Pan-European Transport Corridor IX]
Generated description
Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Pan-European Transport Corridor IX Target entity description: Pan-European Transport Corridor IX is a major trans-European transport route connecting northern and southern Europe, facilitating trade and mobility across multiple countries including Greece and Bulgaria.
-
A.
Pan-European Corridor IV
Pan-European Corridor IV is a major trans-European transport route linking Central Europe with Greece and Turkey through a network of road and rail connections.
-
B.
Pan-European Corridor III
Pan-European Corridor III is a major trans-European transport route linking Western and Eastern Europe, running from Germany through Poland and Ukraine toward Eastern markets.
-
C.
Scandinavia–Central Europe transport corridor
The Scandinavia–Central Europe transport corridor is a key trans-European route that links the Nordic countries with central European regions through a network of road, rail, and maritime connections.
-
D.
Corridor X (Pan-European Corridor X)
Corridor X (Pan-European Corridor X) is a major trans-European transport route connecting Central Europe with the Balkans and the Aegean Sea, facilitating significant international road and rail traffic.
-
E.
Pan-European Corridor V
Pan-European Corridor V is a major trans-European transport route that links key cities in Central and Eastern Europe, facilitating trade and mobility between Western Europe and countries such as Ukraine and Poland.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d80769100c819099111274614f5ed2 |
completed | April 9, 2026, 8:09 p.m. |
| NER | Named-entity recognition | batch_69dbbe99ddc08190a8d79107c8e176fa |
completed | April 12, 2026, 3:47 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f7942a29b88190acefc8b3b91d849f |
completed | May 3, 2026, 6:30 p.m. |
| NEDg | Description generation | batch_69f7958459f48190bb5f175c54dcec5b |
completed | May 3, 2026, 6:35 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69f7965cc9f88190acbf232615a9e87b |
completed | May 3, 2026, 6:39 p.m. |
Created at: April 9, 2026, 9:48 p.m.