Triple

T13529248
Position Surface form Disambiguated ID Type / Status
Subject Shuttle–Mir Program E323088 entity
Predicate notableMission P68 FINISHED
Object STS-89 E396036 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-89 | Statement: [Shuttle–Mir Program, notableMission, STS-89]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-89
Context triple: [Shuttle–Mir Program, notableMission, STS-89]
  • A. STS-89 chosen
    STS-89 was a NASA Space Shuttle mission to the Russian Mir space station that conducted crew transfer and scientific research as part of the Shuttle–Mir program.
  • B. STS-86
    STS-86 was a 1997 NASA Space Shuttle mission that conducted a docking with the Russian Mir space station as part of the Shuttle–Mir program.
  • C. STS-88
    STS-88 was the first Space Shuttle mission to the International Space Station, delivering and assembling its initial U.S. and Russian modules in orbit.
  • D. STS-79
    STS-79 was a 1996 Space Shuttle Atlantis mission notable for delivering supplies to the Russian Mir space station and returning astronaut Shannon Lucid to Earth after her long-duration stay in orbit.
  • E. STS-69
    STS-69 was a 1995 NASA Space Shuttle Endeavour mission that deployed and retrieved multiple scientific payloads, including the Wake Shield Facility, to conduct microgravity and materials science experiments in low Earth orbit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80766a21881909f21a1b7421d3b8a completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbafba2c308190873efd15dfe26358 completed April 12, 2026, 2:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69fde15abe6c8190a6212861bbce790e completed May 8, 2026, 1:12 p.m.
Created at: April 9, 2026, 9:44 p.m.