Triple

T12945156
Position Surface form Disambiguated ID Type / Status
Subject CAMELS rating system E309741 entity
Predicate instanceOf P0 FINISHED
Object bank supervisory rating system C16637 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bank supervisory rating system
Context triple: [CAMELS rating system, instanceOf, bank supervisory rating system]
  • A. central bank supervisory role
    The central bank supervisory role encompasses the oversight, regulation, and examination of financial institutions to ensure their safety, soundness, and compliance with prudential standards, thereby safeguarding financial stability and protecting depositors.
  • B. organ of the European Systemic Risk Board
    An organ of the European Systemic Risk Board is a formal institutional body within the ESRB’s governance structure that performs specific functions related to the identification, assessment, and mitigation of systemic risks to the EU financial system.
  • C. credit rating agency
    A credit rating agency is an organization that evaluates and assigns creditworthiness scores or ratings to entities such as corporations, governments, and financial instruments, indicating their relative risk of default.
  • D. central banking system
    A central banking system is a national financial institution framework responsible for issuing currency, managing monetary policy, regulating the money supply, and overseeing the stability and liquidity of the banking sector.
  • E. quality assessment system chosen
    A quality assessment system is a structured framework of processes, tools, and criteria used to evaluate, measure, and ensure that products, services, or operations meet defined standards and performance expectations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdfb57a88190836b743e2825feca completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:43 p.m.