Triple

T11562509
Position Surface form Disambiguated ID Type / Status
Subject Mariner program E274178 entity
Predicate includes P1393 FINISHED
Object Mariner 2 E272868 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mariner 2 | Statement: [Mariner program, includes, Mariner 2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mariner 2
Context triple: [Mariner program, includes, Mariner 2]
  • A. Mariner 2 chosen
    Mariner 2 was a NASA space probe launched in 1962 that became the first successful mission to conduct a close-up flyby and scientific study of Venus.
  • B. Mariner 4
    Mariner 4 was a NASA spacecraft that performed the first successful flyby of Mars in 1965, returning the first close-up images of another planet.
  • C. Mariner 5
    Mariner 5 was a NASA space probe launched in 1967 that conducted a successful flyby of Venus, providing important data on the planet’s atmosphere and environment.
  • D. Mariner 3
    Mariner 3 was an early NASA unmanned spacecraft launched in 1964 as part of the Mariner program, intended for a Mars flyby mission but rendered unsuccessful due to a launch vehicle shroud failure.
  • E. Mariner 1
    Mariner 1 was an early NASA interplanetary probe intended for a Venus flyby that was destroyed shortly after launch in 1962 due to a guidance system malfunction.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae5ac3c81908d2b0a3a665665b2 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d88dd2016481909b33848af3d1d6c1 completed April 10, 2026, 5:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69e6e89e73b481908175576f4ec8d39a completed April 21, 2026, 3:01 a.m.
Created at: April 8, 2026, 9:37 p.m.