Triple

T11078754
Position Surface form Disambiguated ID Type / Status
Subject OV-102 Columbia E261932 entity
Predicate precededBy P97 FINISHED
Object Enterprise (OV-101) E684167 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Enterprise (OV-101) | Statement: [OV-102 Columbia, precededBy, Enterprise (OV-101)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Enterprise (OV-101)
Context triple: [OV-102 Columbia, precededBy, Enterprise (OV-101)]
  • A. Enterprise (OV-101 test vehicle) chosen
    Enterprise (OV-101) was NASA’s first Space Shuttle orbiter, built as a test vehicle for atmospheric flight and landing trials that paved the way for the operational shuttle fleet.
  • B. OV-102 Columbia
    OV-102 Columbia was NASA’s first operational Space Shuttle orbiter, notable for pioneering numerous missions in the Space Shuttle program before its loss in 2003.
  • C. A-100 Premier
    The A-100 Premier is a modern Russian airborne early warning and control (AEW&C) aircraft designed to provide advanced radar surveillance, command, and battle management capabilities.
  • D. Enterprise (test orbiter)
    Enterprise (test orbiter) was NASA’s first Space Shuttle orbiter, built as a prototype for approach and landing tests and never flown in space.
  • E. AC-10
    AC-10 was a class of Southern Pacific Railroad cab-forward articulated steam locomotives built for heavy freight service over mountainous routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa9983c08190b0ef61603b69feac completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d799953d58819096b645a1377e70f2 completed April 9, 2026, 12:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69e3c8d4f22881909fa3d094a19b0a14 completed April 18, 2026, 6:09 p.m.
Created at: April 8, 2026, 9:27 p.m.