Triple

T10982178
Position Surface form Disambiguated ID Type / Status
Subject Sopwith 1½ Strutter E259534 entity
Predicate typicalEngineModel P2092 FINISHED
Object Clerget 9B E105709 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Clerget 9B | Statement: [Sopwith 1½ Strutter, typicalEngineModel, Clerget 9B]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Clerget 9B
Context triple: [Sopwith 1½ Strutter, typicalEngineModel, Clerget 9B]
  • A. Clerget 9B chosen
    The Clerget 9B is a World War I-era French nine-cylinder rotary aircraft engine widely used in British fighter planes.
  • B. Breguet 693
    The Breguet 693 was a French twin-engine light bomber and ground-attack aircraft used by the Armée de l’Air in the early stages of World War II.
  • C. Bléré
    Bléré is a small commune in central France’s Indre-et-Loire department, known for its location in the Loire Valley near historic châteaux and its setting along the Cher River.
  • D. French D900
    The French D900 is a departmental road in southeastern France that serves as a key route through the Alps, connecting to the Col de Larche mountain pass near the Italian border.
  • E. SNCASO SO.30 Bretagne
    The SNCASO SO.30 Bretagne was a post-World War II French twin-engine airliner designed for medium-range passenger and mail transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa895f4c8190887a15460ef622f4 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d772eb518c8190a885a417815f2ff6 completed April 9, 2026, 9:35 a.m.
NED1 Entity disambiguation (via context triple) batch_69e344c77d6c8190a9b5e2cc967fb031 completed April 18, 2026, 8:45 a.m.
Created at: April 8, 2026, 9:24 p.m.