Triple

T10842043
Position Surface form Disambiguated ID Type / Status
Subject Major Archeparchy of Hajdúdorog E255910 entity
Predicate usesCalendar P1818 FINISHED
Object Gregorian calendar E4645 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gregorian calendar | Statement: [Major Archeparchy of Hajdúdorog, usesCalendar, Gregorian calendar]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gregorian calendar
Context triple: [Major Archeparchy of Hajdúdorog, usesCalendar, Gregorian calendar]
  • A. Gregorian
    Gregorian is a German musical group known for performing popular songs in a distinctive Gregorian chant-inspired style.
  • B. Gregorian calendar (Western churches) chosen
    The Gregorian calendar (Western churches) is the internationally used solar dating system introduced in 1582 that most Western Christian churches follow for determining liturgical dates and feasts.
  • C. Julian calendar
    The Julian calendar is an ancient solar calendar introduced by Julius Caesar in 45 BCE, historically used throughout Europe and still employed by some Eastern Christian churches for liturgical purposes.
  • D. Ambrosian calendar
    The Ambrosian calendar is the liturgical calendar of the Ambrosian Rite used primarily in the Archdiocese of Milan, featuring its own cycle of feasts and observances distinct from the Roman Rite.
  • E. Revised Julian calendar
    The Revised Julian calendar is a modernized version of the traditional Julian calendar, adopted by several Eastern Orthodox Churches to more closely align fixed feast dates with the Gregorian calendar while retaining the Orthodox Paschalion.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa81a5d08190aa86689061d1ddd2 completed April 8, 2026, 7:20 p.m.
NER Named-entity recognition batch_69d750ccb95c81908fec4885e6172f78 completed April 9, 2026, 7:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69deb153de988190bd48f1c1980d7ca2 completed April 14, 2026, 9:27 p.m.
Created at: April 8, 2026, 9:19 p.m.