commissioningEndDate
P56682
predicate
Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
All labels observed (5)
| Label | Occurrences |
|---|---|
| commissioningCompleted | 6 |
| commissioningEndDate canonical | 3 |
| commissioningCompletionDate | 1 |
| fullCommissioningDate | 1 |
| fullyCommissionedDate | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: commissioningEndDate
Generated description
Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
Sample triples (12)
| Subject | Object |
|---|---|
| Itaipu Dam | 1991 ⓘ |
| Nathpa Jhakri Dam | 2004 ⓘ |
|
Muskrat Falls dam
surface form:
Muskrat Falls Generating Station
|
2021 via predicate surface "fullyCommissionedDate" ⓘ |
| VLT Survey Telescope | around 2011 via predicate surface "commissioningCompleted" ⓘ |
| Manapouri Power Station | 1972 via predicate surface "fullCommissioningDate" ⓘ |
| Sayano–Shushenskaya Dam | 1985 via predicate surface "commissioningCompleted" ⓘ |
| MAG | 2006 via predicate surface "commissioningCompleted" ⓘ |
| Kettle Generating Station | 1974 ⓘ |
| IRDIS | 2014 via predicate surface "commissioningCompleted" ⓘ |
| Xiangjiaba Dam | 2014 via predicate surface "commissioningCompleted" ⓘ |
| Xiluodu Dam | 2014 via predicate surface "commissioningCompleted" ⓘ |
| Wudongde Dam | 2021 via predicate surface "commissioningCompletionDate" ⓘ |