hasRiskManaged
P194842
predicate
Indicates that a potential or existing risk associated with an entity has been identified and is being actively controlled, mitigated, or otherwise managed.
Sample triples (6)
| Subject | Object |
|---|---|
| Panama Canal construction planning and organization | tropical disease ⓘ |
| Panama Canal construction planning and organization | landslides in Culebra Cut ⓘ |
| Panama Canal construction planning and organization | flooding and water control ⓘ |
| Panama Canal construction planning and organization | labor unrest ⓘ |
| Panama Canal construction planning and organization | cost overruns ⓘ |
| Panama Canal construction planning and organization | engineering failure of locks or dams ⓘ |