Wadala Depot–Jacob Circle
E926269
Wadala Depot–Jacob Circle is the second-phase stretch of Mumbai Monorail’s Line 1 that extends the route southward through central Mumbai.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Wadala Depot–Jacob Circle canonical | 1 |
Statements (33)
| Predicate | Object |
|---|---|
| instanceOf |
Mumbai Monorail section
ⓘ
rapid transit line segment ⓘ |
| alsoKnownAs |
Phase 2 of Mumbai Monorail Line 1
NERFINISHED
ⓘ
Wadala Depot–Sant Gadge Maharaj Chowk section NERFINISHED ⓘ |
| character | elevated ⓘ |
| city | Mumbai NERFINISHED ⓘ |
| connectsArea |
Jacob Circle
NERFINISHED
ⓘ
Lower Parel NERFINISHED ⓘ Mahalaxmi NERFINISHED ⓘ Parel NERFINISHED ⓘ Wadala NERFINISHED ⓘ |
| country | India ⓘ |
| electrification | 750 V DC third rail ⓘ |
| endStation | Jacob Circle NERFINISHED ⓘ |
| extendsDirection | southward ⓘ |
| gauge | straddle-beam monorail ⓘ |
| lineColor | pink ⓘ |
| locatedIn |
India
ⓘ
Maharashtra ⓘ Mumbai ⓘ |
| numberOfTracks | 2 ⓘ |
| openedForPublic | 2019 ⓘ |
| operator | Mumbai Metropolitan Region Development Authority NERFINISHED ⓘ |
| owner | Mumbai Metropolitan Region Development Authority NERFINISHED ⓘ |
| partOf | Mumbai Monorail Line 1 NERFINISHED ⓘ |
| phaseOfConstruction | second phase of Mumbai Monorail Line 1 ⓘ |
| projectAuthority | Mumbai Metropolitan Region Development Authority NERFINISHED ⓘ |
| region | Mumbai Metropolitan Region NERFINISHED ⓘ |
| rollingStock | Scomi SUTRA trains ⓘ |
| servesArea | central Mumbai NERFINISHED ⓘ |
| startStation | Wadala Depot NERFINISHED ⓘ |
| system | Mumbai Monorail NERFINISHED ⓘ |
| transitType | monorail ⓘ |
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.
subject surface form:
Line 1 (Mumbai Monorail)