Madrid–Valladolid high-speed line
E791181
The Madrid–Valladolid high-speed line is a major Spanish AVE railway corridor connecting Madrid with Valladolid as part of the country’s high-speed rail network.
Statements (50)
| Predicate | Object |
|---|---|
| instanceOf |
high-speed railway line
ⓘ
railway infrastructure project ⓘ |
| connects |
Madrid
NERFINISHED
ⓘ
Valladolid NERFINISHED ⓘ |
| constructionStart | 1990s ⓘ |
| country | Spain ⓘ |
| crossesMountainRange | Sierra de Guadarrama NERFINISHED ⓘ |
| electrification | 25 kV AC 50 Hz overhead line ⓘ |
| endPoint | Valladolid NERFINISHED ⓘ |
| endStation | Valladolid-Campo Grande railway station NERFINISHED ⓘ |
| formsCorridorTo |
Basque Country
NERFINISHED
ⓘ
Cantabria NERFINISHED ⓘ Galicia NERFINISHED ⓘ northwest Spain ⓘ |
| formsPartOfAxis |
Madrid–Valladolid–Galicia high-speed corridor
NERFINISHED
ⓘ
Madrid–Valladolid–León high-speed corridor NERFINISHED ⓘ |
| gauge | 1,435 mm standard gauge ⓘ |
| GuadarramaTunnelLength | approximately 28.4 km ⓘ |
| hasStructure |
Guadarrama Tunnel
NERFINISHED
ⓘ
Túnel de Guadarrama NERFINISHED ⓘ |
| length | approximately 179 km ⓘ |
| locatedIn | Spain ⓘ |
| maximumDesignSpeed | 350 km/h ⓘ |
| openedForPassengerService | 2007-12-22 ⓘ |
| openingDate | 2007-12-22 ⓘ |
| operator |
ADIF
NERFINISHED
ⓘ
Administrador de Infraestructuras Ferroviarias NERFINISHED ⓘ |
| partOf |
Red Ferroviaria de Alta Velocidad (Spain)
NERFINISHED
ⓘ
Spanish high-speed rail network NERFINISHED ⓘ |
| passesThrough |
Castile and León
NERFINISHED
ⓘ
Community of Madrid NERFINISHED ⓘ |
| previousMainRoute | conventional Madrid–Valladolid railway line NERFINISHED ⓘ |
| primaryServiceType | long-distance high-speed services ⓘ |
| purpose | passenger transport ⓘ |
| railwayNetworkRole | northern branch of Spain’s high-speed network ⓘ |
| reducesTravelTimeBetween |
Madrid
NERFINISHED
ⓘ
Valladolid NERFINISHED ⓘ |
| secondaryServiceType | medium-distance high-speed services ⓘ |
| signallingSystem |
ERTMS
NERFINISHED
ⓘ
ETCS NERFINISHED ⓘ |
| startPoint | Madrid NERFINISHED ⓘ |
| startStation | Madrid-Chamartín railway station NERFINISHED ⓘ |
| status | in operation ⓘ |
| trackConfiguration | double track ⓘ |
| travelTimeMadridValladolidAfterOpening | about 55 minutes ⓘ |
| typicalOperatingSpeed | 300 km/h ⓘ |
| usedBy |
AVE
NERFINISHED
ⓘ
Alvia NERFINISHED ⓘ Avant NERFINISHED ⓘ Renfe Operadora NERFINISHED ⓘ |
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.