The Sir Adam Beck Hydroelectric Generating Stations are a major complex of hydroelectric power plants on the Niagara River in Ontario, Canada, that harness the flow of Niagara Falls to generate electricity for the province.

Jump to: Surface forms Statements Referenced by

Observed surface forms (2)


Statements (49)

Predicate Object
instanceOf hydroelectric power station complex
run-of-the-river hydroelectric power plant
connectsTo Ontario electricity grid
surface form: Ontario high-voltage transmission network

Eastern Interconnection
surface form: Ontario–New York interconnection
country Canada
environmentalContext Great Lakes–St. Lawrence system
surface form: Great Lakes–St. Lawrence basin
expandedIn 1950s
generationType renewable energy
gridConnection Ontario electricity grid
hasAssociatedStructure Niagara River control structures
water diversion tunnels
hasMaximumGeneratingCapacity approximately 1,499 MW
approximately 1,900 MW
approximately 498 MW
hasPart Sir Adam Beck Hydroelectric Generating Stations self-linksurface differs
surface form: Sir Adam Beck I Generating Station

Sir Adam Beck Hydroelectric Generating Stations self-linksurface differs
surface form: Sir Adam Beck II Generating Station
hasReservoir Niagara River diversion reservoirs
heritageStatus major historic hydroelectric development in Canada
inception 1922
1922
1954
inceptionPart Sir Adam Beck Hydroelectric Generating Stations self-linksurface differs
surface form: Sir Adam Beck I Generating Station
locatedDownstreamOf Niagara Falls
locatedIn Niagara Falls region
surface form: Niagara Falls, Ontario

Niagara River
locatedInAdministrativeTerritory Ontario
Regional Municipality of Niagara
locatedInTimeZone Eastern Time Zone
locatedNear Lewiston, New York NERFINISHED
Queenston, Upper Canada
surface form: Queenston, Ontario
locatedUpstreamOf Queenston-Lewiston Bridge
surface form: Queenston–Lewiston Bridge
namedAfter Adam Beck
numberOfTurbines over 30
operator Ontario Power Generation
ownedBy Ontario Power Generation
partOf Niagara River hydropower system
primaryFuel hydropower
purpose electricity generation
harnessing Niagara River flow
regulatesFlowOf Niagara Falls
regulatoryAuthority Ontario Energy Board
significantFor Ontario electricity supply
binational Niagara hydropower development
startOfConstruction 1917
1949
subjectOf Boundary Waters Treaty of 1909
surface form: Canada–United States Niagara River water diversion treaties
usesTurbineType Francis turbine
usesWaterSource Niagara Falls
watercourse Niagara River

Referenced by (4)

Full triples — surface form annotated when it differs from this entity's canonical label.

Sir Adam Beck Hydroelectric Generating Stations hasPart Sir Adam Beck Hydroelectric Generating Stations self-linksurface differs
this entity surface form: Sir Adam Beck I Generating Station
Sir Adam Beck Hydroelectric Generating Stations hasPart Sir Adam Beck Hydroelectric Generating Stations self-linksurface differs
this entity surface form: Sir Adam Beck II Generating Station
Niagara Falls hasPowerPlant Sir Adam Beck Hydroelectric Generating Stations
Sir Adam Beck Hydroelectric Generating Stations inceptionPart Sir Adam Beck Hydroelectric Generating Stations self-linksurface differs
this entity surface form: Sir Adam Beck I Generating Station