Jakarta MRT
E590852
Jakarta MRT is a rapid transit system serving Indonesia’s capital region, designed to reduce congestion and improve urban mobility through modern, high-capacity rail services.
Observed surface forms (1)
| Surface form | Occurrences |
|---|---|
| Jakarta MRT North–South Line | 1 |
Statements (50)
| Predicate | Object |
|---|---|
| instanceOf |
metro system
ⓘ
public transport infrastructure ⓘ rapid transit system ⓘ |
| connectsWith |
KRL Commuterline
NERFINISHED
ⓘ
TransJakarta bus rapid transit ⓘ |
| constructionStartDate | 2013 ⓘ |
| country | Indonesia ⓘ |
| designSpeed | up to about 100 km/h ⓘ |
| electrification | overhead catenary ⓘ |
| environmentalGoal |
lower urban air pollution
ⓘ
reduce private car usage ⓘ |
| fareSystem | distance-based fare ⓘ |
| fundingSource |
Government of Indonesia
NERFINISHED
ⓘ
Japan International Cooperation Agency loan ⓘ Provincial Government of DKI Jakarta NERFINISHED ⓘ |
| hasFeature |
accessibility features for disabled passengers
ⓘ
air-conditioned trains ⓘ platform screen doors at underground stations ⓘ |
| hasLine | North–South Line NERFINISHED ⓘ |
| hasPhase | Phase 1 Lebak Bulus–Bundaran HI ⓘ |
| hasPlannedExtension | North–South Line Phase 2 to Kota NERFINISHED ⓘ |
| hasPlannedLine | East–West Line NERFINISHED ⓘ |
| lineColor | North–South Line – dark blue ⓘ |
| locatedIn |
Jakarta
NERFINISHED
ⓘ
Jakarta metropolitan area NERFINISHED ⓘ |
| numberOfLines | 1 (operational, North–South Line Phase 1) ⓘ |
| numberOfStations | 13 (Phase 1) ⓘ |
| openingDate | 24 March 2019 ⓘ |
| operatingSpeed | around 80 km/h ⓘ |
| operator | PT MRT Jakarta NERFINISHED ⓘ |
| owner | Provincial Government of DKI Jakarta NERFINISHED ⓘ |
| partOf | Jakarta public transportation network NERFINISHED ⓘ |
| purpose |
improve urban mobility
ⓘ
provide high-capacity rail services ⓘ reduce traffic congestion ⓘ |
| rollingStockManufacturer |
Nippon Sharyo
NERFINISHED
ⓘ
Sumitomo Corporation NERFINISHED ⓘ |
| rollingStockType | electric multiple units ⓘ |
| safetySystem |
automatic train operation
ⓘ
automatic train protection ⓘ |
| serves |
Greater Jakarta
NERFINISHED
ⓘ
Jakarta NERFINISHED ⓘ |
| stationType |
elevated stations
ⓘ
underground stations ⓘ |
| systemLength | approximately 16 kilometers (Phase 1) ⓘ |
| terminus |
Bundaran HI Station
NERFINISHED
ⓘ
Lebak Bulus Grab Station NERFINISHED ⓘ |
| ticketingSystem |
contactless smart card
ⓘ
single-trip ticket ⓘ |
| trackGauge | standard gauge ⓘ |
Referenced by (5)
Full triples — surface form annotated when it differs from this entity's canonical label.
subject surface form:
TransJakarta
this entity surface form:
Jakarta MRT North–South Line