Basin Plan 2012
E528438
Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
All labels observed (2)
| Label | Occurrences |
|---|---|
| Basin Plan 2012 canonical | 1 |
| Murray–Darling Basin Plan | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T5512006 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Basin Plan 2012 Context triple: [New South Wales water management framework, implements, Basin Plan 2012]
-
A.
Bay-Delta Conservation Plan
The Bay-Delta Conservation Plan is a large-scale habitat conservation and water management initiative aimed at restoring ecological health and improving water supply reliability in California’s Sacramento–San Joaquin River Delta.
-
B.
Delta Plan
The Delta Plan is a comprehensive Dutch flood protection and water management project designed to safeguard the low-lying Netherlands from the sea through an extensive system of dams, storm surge barriers, and dikes.
-
C.
Delta Plan
The Delta Plan is a comprehensive, long-term management and conservation strategy designed to protect, restore, and sustainably manage California’s Sacramento–San Joaquin River Delta ecosystem and water supply.
-
D.
Carson River Watershed Adaptive Stewardship Plan
The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
-
E.
New South Wales water management framework
The New South Wales water management framework is the legislative and regulatory system that governs how water resources are allocated, used, and protected across the state of New South Wales, Australia.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Basin Plan 2012 Target entity description: Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
-
A.
Bay-Delta Conservation Plan
The Bay-Delta Conservation Plan is a large-scale habitat conservation and water management initiative aimed at restoring ecological health and improving water supply reliability in California’s Sacramento–San Joaquin River Delta.
-
B.
Delta Plan
The Delta Plan is a comprehensive Dutch flood protection and water management project designed to safeguard the low-lying Netherlands from the sea through an extensive system of dams, storm surge barriers, and dikes.
-
C.
Delta Plan
The Delta Plan is a comprehensive, long-term management and conservation strategy designed to protect, restore, and sustainably manage California’s Sacramento–San Joaquin River Delta ecosystem and water supply.
-
D.
Carson River Watershed Adaptive Stewardship Plan
The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
-
E.
New South Wales water management framework
The New South Wales water management framework is the legislative and regulatory system that governs how water resources are allocated, used, and protected across the state of New South Wales, Australia.
- F. None of above. chosen
Statements (49)
| Predicate | Object |
|---|---|
| instanceOf |
Australian statutory instrument
ⓘ
Murray–Darling Basin plan ⓘ water management plan ⓘ |
| administeredBy | Murray–Darling Basin Authority NERFINISHED ⓘ |
| aimsTo |
coordinate water management across Basin states and the Commonwealth
ⓘ
improve the health of rivers, wetlands and floodplains in the Murray–Darling Basin ⓘ limit the volume of water that can be taken from the Basin for consumptive use ⓘ provide greater security and certainty for water users ⓘ support the resilience of Basin ecosystems under climate variability and change ⓘ |
| appliesTo | Murray–Darling Basin NERFINISHED ⓘ |
| basedOnAct | Water Act 2007 NERFINISHED ⓘ |
| cameIntoEffect | 2012 ⓘ |
| coordinates |
environmental watering across the Murray–Darling Basin
ⓘ
water sharing arrangements between Basin states ⓘ |
| country | Australia ⓘ |
| hasComponent |
Schedule 1 Basin water resources and areas
ⓘ
Schedule 2 long‑term average sustainable diversion limits ⓘ Schedule 3 water quality and salinity targets ⓘ Schedule 4 water trading rules ⓘ |
| hasPurpose |
to manage water resources in the Murray–Darling Basin in an integrated and sustainable way
ⓘ
to protect and restore environmental assets and ecosystem functions ⓘ to provide for the use and management of Basin water resources in a way that optimises economic, social and environmental outcomes ⓘ to set sustainable diversion limits for water extractions ⓘ |
| includesProvision |
environmental watering plan
ⓘ
monitoring and evaluation framework ⓘ requirements for reporting and compliance ⓘ requirements for water resource plans ⓘ sustainable diversion limits ⓘ water quality and salinity management plan ⓘ water trading rules ⓘ |
| jurisdiction | Commonwealth of Australia NERFINISHED ⓘ |
| legalStatus | legally binding on the Commonwealth and Basin states ⓘ |
| protects |
key ecosystem functions in the Murray–Darling Basin
ⓘ
key environmental assets in the Murray–Darling Basin ⓘ water quality in the Murray–Darling Basin ⓘ water‑dependent biodiversity in the Murray–Darling Basin ⓘ |
| regulates |
groundwater resources in the Murray–Darling Basin
ⓘ
surface water resources in the Murray–Darling Basin ⓘ |
| relatedTo |
Murray–Darling Basin Agreement
NERFINISHED
ⓘ
National Water Initiative NERFINISHED ⓘ |
| requires |
Basin states to prepare water resource plans consistent with the Basin Plan
ⓘ
monitoring of social, economic and environmental outcomes ⓘ periodic review and adjustment of sustainable diversion limits ⓘ |
| scope | all Basin water resources as defined in the Water Act 2007 ⓘ |
| sets |
long‑term average sustainable diversion limits
ⓘ
sustainable diversion limits for Basin water resources ⓘ |
| subjectTo |
amendment by legislative instrument
ⓘ
review by the Murray–Darling Basin Authority ⓘ |
| supports | water trading within and between Basin states ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Basin Plan 2012 Description of subject: Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
Referenced by (2)
Full triples — surface form annotated when it differs from this entity's canonical label.