Triple
T9985712
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Shriver Report |
E196562
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | social research project |
C120
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: social research project Context triple: [The Shriver Report, instanceOf, social research project]
-
A.
research project
chosen
A research project is a structured, systematic investigation designed to answer specific questions or test hypotheses by collecting, analyzing, and interpreting data within a defined scope and timeframe.
-
B.
social science
Social science is the systematic study of human society, social relationships, and institutions using empirical and theoretical methods to understand patterns of behavior and social structures.
-
C.
socio-economic study
A socio-economic study is a systematic analysis of how social factors and economic conditions interact to influence individuals, communities, and broader societal outcomes.
-
D.
panel survey
A panel survey is a longitudinal study method that repeatedly collects data from the same group of respondents over multiple time points to track changes and trends.
-
E.
social scientist
A social scientist is a researcher who systematically studies human behavior, social relationships, and societal structures using empirical methods to understand and explain social phenomena.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82efbce081908179b4b9c65096eb |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 8:49 p.m.