Triple
T9979870
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Meoto Iwa |
E196423
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Shinto sacred site |
C1951
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Shinto sacred site Context triple: [Meoto Iwa, instanceOf, Shinto sacred site]
-
A.
religious site
A religious site is a designated place or structure where individuals or communities engage in worship, rituals, and other practices associated with their faith or spiritual beliefs.
-
B.
religious shrine
chosen
A religious shrine is a sacred place or structure dedicated to a deity, saint, spirit, or revered figure, where individuals come to offer prayers, rituals, and acts of devotion.
-
C.
Jewish pilgrimage site
A Jewish pilgrimage site is a location of religious and historical significance in Judaism to which individuals or communities travel, traditionally or in contemporary practice, for prayer, commemoration, and spiritual connection.
-
D.
form of Shinto
A form of Shinto is a distinct expression or tradition within the broader Shinto religion, characterized by its particular rituals, beliefs, deities, and regional or historical influences.
-
E.
Tenman-gū shrine
A Tenman-gū shrine is a Shinto shrine dedicated to Sugawara no Michizane, revered as Tenjin, the kami of scholarship, learning, and the arts.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82efbce081908179b4b9c65096eb |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 8:49 p.m.