Triple

T9957755
Position Surface form Disambiguated ID Type / Status
Subject October 2018 Update (1809) E195486 entity
Predicate alsoKnownAs P39 FINISHED
Object Redstone 5
Redstone 5 is the internal codename for the Windows 10 October 2018 Update (version 1809), a major feature update to Microsoft's Windows 10 operating system.
E836652 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Redstone 5 | Statement: [October 2018 Update (1809), alsoKnownAs, Redstone 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Redstone 5
Context triple: [October 2018 Update (1809), alsoKnownAs, Redstone 5]
  • A. Redstone 4
    Redstone 4 is the internal codename for Microsoft's Windows 10 April 2018 Update (version 1803), a major feature update to the Windows 10 operating system.
  • B. Redstone
    Redstone is a prominent American media family name most closely associated with the leadership of Viacom and Paramount Global.
  • C. Redstone 1
    Redstone 1 is the codename for the first major wave of Microsoft's Windows 10 Anniversary Update development, following the earlier Threshold releases.
  • D. Redstone Gateway
    Redstone Gateway is a mixed-use office and technology park development in Huntsville, Alabama, serving as a major hub for defense, aerospace, and high-tech companies near Redstone Arsenal.
  • E. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Redstone 5
Triple: [October 2018 Update (1809), alsoKnownAs, Redstone 5]
Generated description
Redstone 5 is the internal codename for the Windows 10 October 2018 Update (version 1809), a major feature update to Microsoft's Windows 10 operating system.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Redstone 5
Target entity description: Redstone 5 is the internal codename for the Windows 10 October 2018 Update (version 1809), a major feature update to Microsoft's Windows 10 operating system.
  • A. Redstone 4
    Redstone 4 is the internal codename for Microsoft's Windows 10 April 2018 Update (version 1803), a major feature update to the Windows 10 operating system.
  • B. Redstone
    Redstone is a prominent American media family name most closely associated with the leadership of Viacom and Paramount Global.
  • C. Redstone 1
    Redstone 1 is the codename for the first major wave of Microsoft's Windows 10 Anniversary Update development, following the earlier Threshold releases.
  • D. Redstone Gateway
    Redstone Gateway is a mixed-use office and technology park development in Huntsville, Alabama, serving as a major hub for defense, aerospace, and high-tech companies near Redstone Arsenal.
  • E. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82eaaa008190a54fa1a9f954b9ad completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cdb6cceb608190ad4424afaddcabfa completed April 2, 2026, 12:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69d281e1eb848190b898e36ec9821228 completed April 5, 2026, 3:38 p.m.
NEDg Description generation batch_69d282fd10248190a1a0b4573b2065ae completed April 5, 2026, 3:42 p.m.
NED2 Entity disambiguation (via description) batch_69d283d0e1748190a0c65bbaa8e8348e completed April 5, 2026, 3:46 p.m.
Created at: March 30, 2026, 8:46 p.m.