Triple
T9907578
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LIML |
E185051
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | city airport |
C26322
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: city airport Context triple: [LIML, instanceOf, city airport]
-
A.
public airport
A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
-
B.
Airport
An airport is a complex transportation hub where aircraft take off, land, are serviced, and passengers and cargo transition between air and ground travel through various terminals and support facilities.
-
C.
domestic airport
A domestic airport is an aviation facility that handles flights operating solely within a single country's borders, providing passenger, baggage, and aircraft services for internal air travel.
-
D.
airport system
An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
-
E.
airport parking
Airport parking is a designated area or facility where travelers temporarily leave their vehicles while they use air transportation services.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8296165881908ca4750701af1f29 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 8:41 p.m.