Triple

T9900128
Position Surface form Disambiguated ID Type / Status
Subject MSBuild E182261 entity
Predicate abbreviation P43 FINISHED
Object MSBuild E182261 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MSBuild | Statement: [MSBuild, abbreviation, MSBuild]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MSBuild
Context triple: [MSBuild, abbreviation, MSBuild]
  • A. MSBuild chosen
    MSBuild is Microsoft's build engine for .NET and Visual Studio, used to compile, package, and deploy applications based on XML project files.
  • B. Visual Studio
    Visual Studio is Microsoft's integrated development environment (IDE) used for building, debugging, and deploying applications across Windows, web, cloud, and mobile platforms.
  • C. .NET Base Class Library
    The .NET Base Class Library is a core collection of reusable types and APIs that provide fundamental functionality (such as collections, I/O, networking, and threading) for all .NET languages and applications.
  • D. MSVC
    MSVC (Microsoft Visual C++) is Microsoft's proprietary C and C++ compiler and toolset, widely used for Windows application development and integrated into the Visual Studio IDE.
  • E. F Reactor
    F Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82876f8081909cf75df0f99bb13f completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cdb4e0705c8190bd17e36aff615cdd completed April 2, 2026, 12:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1eb1b9534819093c5150f1ed8f685 completed April 5, 2026, 4:54 a.m.
Created at: March 30, 2026, 8:40 p.m.